top of page

Oakland Inner Harbor Pipeline Crossing
East Bay Municipal Utility District 

Oakland, CA

As a part of MCK's On-Call contract for CM services with EBMUD, MCK provided Construction Management Services for the replacement of an existing transmission pipeline with a new pipeline installed beneath the Oakland Inner Harbor and nearly two miles of 24-inch steel pipeline throughout Oakland and Alameda. Work also included installing a flow meter and all associated electrical, civil, and structural appurtenances. This work connected the new crossing to existing transmission mains and further improved the hydraulic connectivity between Alameda and Oakland. 

bottom of page