PROJECT, PROGRAM & CONSTRUCTION MANAGEMENT

MCK provides the leadership to see a project to successful completion. MCK strategizes the program, advises on planning, financing, and the project team, recommends architects, engineers, and contractors, and guides the procurement process. MCK provides advanced project management, design management, and construction management proven with many successful large, complex projects.

FEATURED PROJECTS

FEATURED PROJECTS

San Francisco international airport Air Train
Extension &
Improvements Program

MCK is presently providing Cost Estimating & Scheduling Services under the Project Management Support Services contract for the Air Train Extension and Improvements Program.  The $500 Million project will extend the Air Tran to the Long Term Parking Garage.

sFO t3 west

MCK is presently providing Project Management services for the full modernization of Terminal 3 West.  This $800 Million project will upgrade infrastructure, improve building and technology systems.

San Francisco international airport 
CONSOLIDATED ADMINISTRATION CAMPUs phase 1 

MCK was the Project Manager for the new Consolidated Administration Campus (Phase I) at the San Francisco International Airport (SFO).  The $83 Million project houses five SFO Departments. The project completed June 2018. 

San Francisco 
international
Airport Grand Hyatt hotel 

MCK served as Project Manager for the new Four/Five Star Grand Hyatt Hotel at San Francisco International Airport (SFO). This $237 Million, 351 rooms, state-of-the-art hotel is accessible by Air Train and is located near the International Terminal.  The hotel opened to the public September 2019.

San Francisco 
international
Airport- Long Term parking garage 

MCK provided lead Activation and Commissioning services on the SFO Long Term Paring Garage.  The garage has 6 floors, 3000+ stalls, some EV charging stations with solar panels on the roof.   The parking garage opened February 2019.  

Francisco park

This currently unused space in San Francisco's Russian Hill is currently being transformed into a stunning park with expansive, commanding Bay views. MCK is excited to be involved in this amazing project which will provide multiple park amenities and sure to be a destination for residents and visitors looking to take a breather from the hustle and bustle of the city.  The park is scheduled to open late 2020. 

HELL HOLE DAM RAISE PROJECT

The goal of the Hellhole Dam Raise Project is to increase the dam’s core elevation to 4,651 feet which will provide resolve for the dam’s settling since its construction as well as bring it 2.5 feet above the PMF flood level.  It its current phase, the work consists of temporarily storing approximately 8,000 cubic yards of rip rap excavated from the downstream slope of the dam as well as the construction of a temporary road which will include installation of three temporary ramps connecting to the top of the dam to the first bench on the reservoir side. The existing bench will serve as a temporary haul road. When the project is complete the reservoir could increase by over 10,000 acre-feet of increased seasonal storage. MCK is providing Project Controls, Contract Administration, Cost Estimating and Administration Services on the project.  Read More 

EL DORADO FOREBAY DAM modification

The Forebay Dam and Reservoir is an off-stream reservoir located on the westward side of the Sierra Nevada’s that regulates water for drinking water and hydroelectric power purposes. Operated by El Dorado Irrigation District the dam was originally constructed in 1923 and is a key part of the El Dorado Hydroelectric Project 184. The El Dorado Dam Modification Project will bring this centenarian dam up to current dam safety standards. MCK is providing Project Controls, Cost Estimating, Office Administration, Inspection, Cost Estimating and Scheduling services.  Read More

Richard Nixon Presidential Library Enhancement Project

MCK provided Project Engineering Support Services for the Richard Nixon Foundation on the $15 Million Exhibit & Museum Renovation project.

San Francisco Public Utilities Commission wastewater Program

MCK holds the 5-Year As-Needed Construction Management Contract by the San Francisco Public Utilities Commission.

Santa clara valley water district watersheds capital construction management services

MCK teamed with Mott MacDonald for a 5-Year Watersheds Capital Improvements Program for the Santa Clara Valley Water District.  MCK provided Inspection and Scheduling.