top of page
< Back

Plot 2 Aircraft Parking and South McDonnell Road Realignment

San Francisco International Airport
San Francisco, CA

MCK provided Project Management Support Services as Prime JV PM/CM for the Plot 2 Aircraft Parking Reconfiguration and South McDonnell Road Realignment Project, which re-aligned a segment of South McDonnell Road westward to capture additional Air Operations Area (AOA) space (airside project) to allow for larger aircraft parking at two existing terminal gates and provide additional remote aircraft parking spaces. By allowing larger aircraft at the gates and providing additional remote aircraft parking spaces, airline operational efficiency and safety were greatly enhanced. This active transportation facility project was a construction manager/general contractor delivery method and completed while the roadway and airfield were still actively operational. Construction services included relocation and installation of new utilities, construction of new and interim roadways, sidewalks and gutters, installation of noise and jet blast resistant security fence, construction of new AOA pavement specific to the Federal Aviation Administration pavement design standards and paving for the new Grand Hyatt Hotel building and valet parking lot. MCK provided construction management services including design reviews, construction logistics and field inspections to ensure the project met all FAA standards and requirements as defined in the FAA Advisory Circulars. The project completed on time and within budget allowing for a positive start up to follow on projects.

  • Facebook
  • LinkedIn
  • glassdoor_logo_icon_145247
bottom of page